Vadodara Head Office | PAN India Service Mon - Sat: 9:00 AM - 6:00 PM
Logo
Home About Us All Services Products Catalog RWH & CGWA Calculator CGWA Compliance Guide Clients & Portfolio FAQs Contact Us
Head Office Vadodara

28 & 29 Aura Square, 3rd Floor, Panchavati Circle, Gorwa Refinery Rd, Vadodara, Gujarat 390016

Call +91 8690924755 Download Brochure PDF

CGWA Ground Water Compliance & NOC Guide

End-to-end statutory clearances, mandatory IoT flowmeter telemetry, DWLR piezometers, and artificial recharge compliance for industries across India.

Navigating CGWA Ground Water Regulations for Industrial & Commercial Units

The Central Ground Water Authority (CGWA) under the Ministry of Jal Shakti, Government of India, mandates that all industrial, infrastructure, and mining projects extracting groundwater must obtain a valid No Objection Certificate (NOC).

Non-compliance or unauthorized extraction invites severe environmental compensation penalties, sealing of borewells, and revocation of operating consents. Allegiance Water Management provides turnkey assistance to ensure 100% statutory adherence.

CGWA Flowmeter & IoT Telemetry

The Four Core Pillars of CGWA NOC Compliance

Every industrial unit extracting groundwater must implement and maintain these certified systems.

1. Calibrated Flowmeters & IoT Telemetry

Installation of calibrated electromagnetic flowmeters with tamper-proof seal on all operational abstraction borewells. The flowmeters must connect to GSM/4G IoT telemetry devices transmitting live daily abstraction data to the CGWA cloud server.

Explore CGWA Flowmeters

2. Digital Water Level Recorders (DWLR)

Installation of automated DWLR piezometers constructed within the premises with hydrostatic pressure transducers (up to 400m range) to record static water tables and stream logs via telemetry.

Explore DWLR Units

3. Artificial Recharge Structures (RWH)

Mandatory construction of rooftop rainwater harvesting structures, silt traps, and V-wire injection wells or recharge ponds to replenish groundwater in proportion to the abstracted volume.

Explore V-Wire Injection Wells

4. Comprehensive Water Audits

Preparation and submission of water balance diagrams, specific water consumption audits, and conservation plans every three years by certified energy and water auditors.

Explore Water Audit Services

How Allegiance Secures Your CGWA NOC

1

Hydrogeological & Resistivity Survey

Geophysical assessment of local aquifer layers, water quality, and catchment runoff potential.

2

DPR Preparation & Water Balance Formulation

Formulation of Detailed Project Report (DPR), CAD layout plans, and online CGWA portal application filing.

3

Structure Installation & Telemetry Commissioning

Turnkey construction of V-wire injection wells, flowmeters, and DWLR piezometer telemetry syncing.

4

Inspection Assistance & NOC Grant

Support during official CGWB site inspections, answering queries, and securing final statutory NOC grant.

Schedule Initial CGWA Compliance Consultation